From Emily, our on-site director - "On Wednesday, I had a shipment of 200 bags of cement arriving from Mwanza. It was a hectic morning arranging where the cement should be stored, purchasing a lock, and negotiating a watchman. The driver was never very clear about his arrival time, and with only about twenty minutes to spare, I called Owino and asked if he could find people to help us unload the truck. Because need is so great here, even the villagers most devoted to the health center would like to be paid something. We checked the price of unloading cement in Shirati, and found it was 300/bag. The total would then be 60,000 tsh for the truck! I hoped the Roche people wouldn’t propose such a price. When we finally arrived at the chairman’s office, our new storage location, Owino had a large group waiting. Our truck driver was in a hurry to get back to Mwanza and was pushing us to unload quickly. Owino reminded the villagers that this cement is really for them, not for me or for SHED, but for the benefit of their community. Eleven people then agreed to unload the cement as fast as they could for 2,000 tsh each (about $1.50 US). The scene that followed was inspiring. The men quickly divided themselves, and it looked as if a race had begun. Calling to one another and literally running, they were all determined to keep the cement moving into the storage building as quickly as possible. Though it needed no translation, Killian would sometimes say to me, “That man is saying, ‘We know this is for us. That is why we are willing to sacrifice ourselves.’” or “That one is saying, ‘We are so glad Owino called us so that we can help get this done.’” When the men inside the house started falling behind those unloading the truck and those running it from truck to storage building, I jumped in to help, fully expecting a “No, let me sista.” I believe it was a sign of how seriously they took the work of quickly moving the cement that they readily accepted my help. As we finished stacking, many of those we had hired came inside to count the bags for themselves, to be sure that Roche Health Center was not missing even one bag. The attitude of the villagers is not always easy to decipher as an outsider, but on this day, it couldn’t be mistaken that they view this health center as a great gift that they will gladly give of themselves to help realize. We have another shipment arriving tomorrow, and though it is a Saturday, I can’t wait to go to work."
The Roche Health Center is a zero-energy health center being constructed by local villagers using no power tools in rural Tanzania. This project is being developed by the Village Life Outreach Project (www.villagelifeoutreach.org) and the Shirati Health, Education and Development Foundation in collaboration with the University of Cincinnati School of Architecture and Interior Design. To find out more or to donate, go to www.villagelifeoutreach.org
Friday, May 14, 2010
First major materials delivery
From Emily, our on-site director - "On Wednesday, I had a shipment of 200 bags of cement arriving from Mwanza. It was a hectic morning arranging where the cement should be stored, purchasing a lock, and negotiating a watchman. The driver was never very clear about his arrival time, and with only about twenty minutes to spare, I called Owino and asked if he could find people to help us unload the truck. Because need is so great here, even the villagers most devoted to the health center would like to be paid something. We checked the price of unloading cement in Shirati, and found it was 300/bag. The total would then be 60,000 tsh for the truck! I hoped the Roche people wouldn’t propose such a price. When we finally arrived at the chairman’s office, our new storage location, Owino had a large group waiting. Our truck driver was in a hurry to get back to Mwanza and was pushing us to unload quickly. Owino reminded the villagers that this cement is really for them, not for me or for SHED, but for the benefit of their community. Eleven people then agreed to unload the cement as fast as they could for 2,000 tsh each (about $1.50 US). The scene that followed was inspiring. The men quickly divided themselves, and it looked as if a race had begun. Calling to one another and literally running, they were all determined to keep the cement moving into the storage building as quickly as possible. Though it needed no translation, Killian would sometimes say to me, “That man is saying, ‘We know this is for us. That is why we are willing to sacrifice ourselves.’” or “That one is saying, ‘We are so glad Owino called us so that we can help get this done.’” When the men inside the house started falling behind those unloading the truck and those running it from truck to storage building, I jumped in to help, fully expecting a “No, let me sista.” I believe it was a sign of how seriously they took the work of quickly moving the cement that they readily accepted my help. As we finished stacking, many of those we had hired came inside to count the bags for themselves, to be sure that Roche Health Center was not missing even one bag. The attitude of the villagers is not always easy to decipher as an outsider, but on this day, it couldn’t be mistaken that they view this health center as a great gift that they will gladly give of themselves to help realize. We have another shipment arriving tomorrow, and though it is a Saturday, I can’t wait to go to work."
Wednesday, April 21, 2010
First ISSB bricks
Thursday, April 15, 2010
Roche Health Center digital renderings
Wednesday, March 24, 2010
Water at Roche!
Monday, February 8, 2010
Getting water for the Roche Health Center
Villagers in Roche have been getting most of their water for drinking and sanitation from a small pond that is shared by local livestock. When VLOP began working with the village, they soon learned that many of the diseases they were treating came from water-borne diseases that could be easily avoided with cleaner water. When we began the Roche Health Center project, it became clear that the first requirement was to provide a source of clean water in Roche. The first step occurred today when a borehole was dug by Majitech, Inc. This followed two water surveys and a choice location 350 meters from the health center site. The drillers hit water today at 90 meters below the surface!!!
Tuesday, October 20, 2009
brick training by Makiga
Makiga, Inc (from Nairobi, Kenya) produce hand-powered brick presses for the Interlocking Stabilized Soil Blocks (ISSB). Village Life purchased a straight and curved press for use at the health center and for future use in the region. Below are pictures from the training taken by Emily Roush.
Saturday, November 8, 2008
Studio presentation for SHED